Practical Experience
Demos, lectures, case studies, training courses


Josef-Burger-Strasse 1
Gewerbegebiet Risslersberg
79215 Elzach im Schwarzwald

Phone ++ 49 76 82 - 92 19 04
Fax ++ 49 76 82 - 92 19 05
e-mail:
info@aquaservice-gmbh.com



In our brand-new production hall you can experience a demonstration specifically aligned to your own needs.

high quality processing innovative ideas
> rotoclean* Video
highest efficiency

Practical Examples / Combinations
AC 400
+ wash basin WP2
– painter
>photos/drawings
AC 400
+ wash basin WP1
– window manufacturer
>photos/drawings

AC 400
+ wash basin WP1
– flexographic printing
>photos/drawings
AC 400
+ 2 x wash basin WP1
+ clear water tank 300
>photos/drawings

AC 400
+ wash basin WP2
– painter
>photos/drawings
AC 800
+ wash basin WP2
+ clear water tank-module
>photos/drawings

AC 400
+ 2 x wash basin WP1
+ clear water tank
– school
>photos/drawings







AC 400 + wash basin WP2 – painter
Operation Sequence:
1. The coloured water from the wash basin (1) is automatically discharged via the niropump (4) into the reaction tank (5) until the sensor nivomax* (6) switches off (display wastewater full).
2. After pressing the button "Rührwerk Ein/Aus/Zeit" the necessary flocculation product e.g. aquafloc*7 is added. After the previously set time for mixing (approx. 10 min) the agitator (7) turns off automatically.
3. When the sludge has settled (after approx 15 min) you open the ball valve (K), and the surplus clear water is quickly discharged into the clear water container.
4. By opening the ball valves (
a+b) the flocculated coloured water is drained via the filter (8). The sludge remains in the filter, the processed filtrate flows into the clear water container, and from there into the canalisation.

Top



AC 400 + wash basin WP1 – window manufacturer
Operation Sequence:
1. The coloured water from the wash basin (1) is automatically discharged via the niropump (4) into the reaction tank (5) until the sensor nivomax* (6) switches off (display wastewater full).
2. After pressing the button "Rührwerk Ein/Aus/Zeit" the necessary flocculation product e.g. aquafloc*7 is added. After the previously set time for mixing (approx. 10 min) the agitator (7) turns off automatically.
3. When the sludge has settled (after approx 15 min) you open the ball valve (K), and the surplus clear water is quickly discharged into the clear water container.
4. By opening the ball valves (
a+b) the flocculated coloured water is drained via the filter (8). The sludge remains in the filter, the processed filtrate flows into the clear water container to be reused for further cleaning. The processed water can be reused via the clear water pump (10), and the surplus water is transferred via the filtrate lifting equipment.

Top



AC 400 + wash basin WP1 – flexographic printing
before after
Operation Sequence:
1. By pushing the button "Klarwasser Ein/Aus/Zeit" the reaction tank (5) is filled with the required amount of clear water.
2. By pushing the button "Schmutzwasser Start" the reaction tank gets filled from the dirt water tank (1) via the dirt water pump (2) until the sensor nivomax* (6) switches off (display dirt water full).
3. After pressing the button "Rührwerk Ein/Aus/Zeit" the necessary flocculation product is added. After the previously set time for mixing the agitator (7) turns off automatically.
4. By opening the ball valves (a+b) the flocculated coloured water is drained via the filter (8). The sludge remains in the filter, the processed filtrate flows into the clear water container to be reused for further cleaning (see 1.)

Top



AC 400 + 2 x wash basin WP1 + clear water tank 300
Operation Sequence:
1. The coloured water from the wash basin (1) is automatically discharged via the niropump (4) into the reaction tank (5) until the sensor nivomax* (6) switches off (display wastewater full).
2. After pressing the button "Rührwerk Ein/Aus/Zeit" the necessary flocculation product e.g. aquafloc*7 is added. After the previously set time for mixing (approx. 10 min) the agitator (7) turns off automatically.
3. When the sludge has settled (after approx 15 min) you open the ball valve (K), and the surplus clear water is quickly discharged into the clear water container.
4. By opening the ball valves (a+b) the flocculated coloured water is drained via the filter (8). The sludge remains in the filter, the processed filtrate flows into the clear water container to be reused for further cleaning. The surplus water flows into the canalisation.

Top



AC 400 + wash basin WP2 – painter
before after
Operation Sequence:
1. The coloured water from the wash basin (1) is automatically discharged via the niropump (4) into the reaction tank (5) until the sensor nivomax* (6) switches off (display wastewater full).
2. After pressing the button "Rührwerk Ein/Aus/Zeit" the necessary flocculation product e.g. aquafloc*7 is added. After the previously set time for mixing (approx. 10 min) the agitator (7) turns off automatically.
3. When the sludge has settled (after approx 15 min) you open the ball valve (K), and the surplus clear water is quickly discharged into the clear water container.
4. By opening the ball valves (a+b) the flocculated coloured water is drained via the filter (8). The sludge remains in the filter, the processed filtrate flows into the clear water container, and can be reused for further cleaning via the clear water pump (10). The surplus water flows into the canalisation.

Top



AC 800 + wash basin WP2 + clear water tank-module
Operation Sequence:
1. The coloured water from the wash basin (1) is automatically discharged via the niropump (4) into the reaction tank (5) until the sensor nivomax* (6) switches off (display wastewater full).
2. After pressing the button "Rührwerk Ein/Aus/Zeit" the necessary flocculation product e.g. aquafloc*7 is added. After the previously set time for mixing the agitator (7) turns off automatically.
3. When the sludge has settled (after approx 15 min) you open the ball valve (K), and the surplus clear water is quickly discharged into the clear water container.
4. By opening the ball valves (a+b+c+d) the flocculated coloured water is drained via the filter (8). The sludge remains in the filter, the processed filtrate flows into the clear water container. The surplus water flows into the canalisation.

Top



AC 400 + 2 x wash basin WP1 + clear water tank – school
Operation Sequence:
1. The coloured water from the wash basin (1) is automatically discharged via the niropump (4) into the reaction tank (5) until the sensor nivomax* (6) switches off (display wastewater full).
2. After pressing the button "Rührwerk Ein/Aus/Zeit" the necessary flocculation product e.g. aquafloc*7 is added. After the previously set time for mixing the agitator (7) turns off automatically.
3. When the sludge has settled (after approx 15 min) you open the ball valve (K), and the surplus clear water is quickly discharged into the clear water container.
4. By opening the ball valves (a+b) the flocculated coloured water is drained via the filter (8). The sludge remains in the filter, the processed filtrate flows into the clear water container to be reused for further cleaning. The surplus water flows into the canalisation.

Aqua-Service Industriewasserrecycling GmbH

Top